Facility and Organizational Improvements since 1998


Staff Housing

2001 - 2005 - Purchased, renovated and re-roofed the 63 Ball Road house which has 3 bedrooms and a separate in-law basement apartment.  Renovated the 67 Ball Road home including addition of a deck, new carpet and appliances.   

Offices

1999 - 2002 - The Camp office and pavilion bathrooms are winterized.  A 24x24 addition is added to the District office.  Other improvements include a new septic leech field, new signage and a PA system.

Pavilion

1999 - 2006 - The Pavilion was improved by adding see through rain flaps, tongue and groove walls, a new gas grill and ice machine and exterior lighting.  The bathrooms were renvoated.  The exterior area was improved by adding a garden and flag pole area and a reflection area and peace pole, building a brick Walk of Fame walkway, converting the driveway area into a picnic area and building the Worlds Largest Adirondack Chair.  In 2006, the main parking lot was moved and converted into an upper field. 

Program areas

Arts & Crafts Cabin 

2002 - Rebuilt the front deck, painted and reinstalled existing water hook up.

Health Center

2000 - Renovated and insulated the interior and bathroom.

Pottery
2002 - Rebuilt the front deck, reconnected the cold and hot water and purchased pottery supplies.

Maintenance
2000 - 2004 - Renovated and reconnected the water.

Vespers/Lower Amphitheater
2000 & 2004 - Built the amphitheater and stage.

Amphitheater
2000 - 2004 - Extended amphithatres seating and added a stage and a speaker system.

Dining Hall
2002 - 2003 - Purchased wood stove and new windows and screens, painted floor and building, replaced sink and changed hot water to on-demand.

Cooks Cabin
2002 - Renovated the bathroom.

Archery
2001 - 2002 - Renovated building and rebuilt retaining wall.

Sports Cabin
2005 - Opened up the front of the building and added bleacher stairs and a covering for the lawn mower.

Hobbs Field
1998 - 2005 - Fertilized, rebuilt the infield and added retaining walls to right field and the first base line, and added a scoreboard and waterfountain.  Resurfaced the basketball court, added new hoods and added a retaining wall to court. 

Game Area
1999 - 2005 - Added a miniature golf course, horseshoes and tetherball.

Playground
1999 - 2001 - Built a large playground with 12 elements.

Mountain Biking
1999 - 2004 - Purchased 20 bikes, 30 helmets and a storage shed.

Ropes Course & Adventure Camp
1998 - 2005 - Constucted a 7 element high ropes course, a 10 element low ropes course and a Burma Bridge; added a climbing wall and a debrief area; built 2 storage sheds and purchased a treadwall.

Waterfront
Purchased 26 kayaks and paddles, 50 lifejackets 6 windsurfers.  Added one 40 foot fishing dock, two 80 foot long docks that extends from shore, one 100 foot cross dock that connects the two main docks, a lifeguard chair and a new fence surrounding the swim area.

Other improvements and supplies

50 Adirondack chairs and 75 picnic tables
Design an approved 2,400 gallon/day septic system
Land clearing throughout camp
12 new computers, several printers and a fax machine
Networked system and added a new phone system
New office furniture in each office
Popcorn and cotton candy machines
50 pairs of snowshoes
7 aluminum tables

Camp Lincoln

Online Registration is now Available
 
H1N1 Program Policy

 

School's Out

2010-2011 Registration
 
Now Hiring!

Community

    
 

 

PO Box 729, 67 Ball Road, Kingston, NH 03848 | 603.642.3361