Facility and Organizational Improvements Since 1998


Staff Housing

  • Purchased the 63 Ball Road home with three bedrooms upstairs and a separate in law apartment in the basement. (2001)
  • Complete renovation (2001-2002)
    • New carpet
    • Paint
    • Upgrade downstairs bathroom, bedroom and cooking area
    • New ceiling in basement
  • Re roof the house (2003)
  • New deck at the 67 Ball Rd. home (2001)
  • Renovate the 67 Ball Road home (2005)
    • New carpet
    • Completely painted
    • New appliances (stove, microwave, fridge, oven)
    • New ceiling tiles in the bathroom
 

Offices

  • Winterize the camp office (2000-2001)
    • New carpet
    • New heater
    • Renovate two offices and add paneling
    • Winterize the pavilion bathrooms
    • Insulate the ceiling and walls
  • Year round office
    • Build a 24’ x 24’ addition onto building (1999-2000)
    • Re roof (1999)
    • Re carpet (2000)
    • New septic leech field for year round office (2002)
  • New signage (1999-2000))
  • A PA System (2000)
  • Paint the camp and year round offices (2001)

Pavilion

  • Purchase and install see through rain flaps (1999-2000)
  • Paint the name onto the front of the pavilion (2000)
  • Paint/trim the pavilion (2001)
  • Build a garden and flag pole area (1999)
  • Build a reflection area and put peace pole (2003-2004)
  • Renovate bathrooms (2004)
    • Tongue and groove walls
    • Build new stalls
    • New sinks/toilets
    • Paint ceilings(2005)
  • Purchase new gas grill (2000)
  • Purchase ice machine (2000)
  • Build a 14’ brick walkway around the pavilion (2004-2005)
  • Build a “Walk of Fame” showpiece at the end of the brick walkway (2005)
  • Landscape Center of Camp
    • Convert the driveway in front of the year round building into a picnic area. (2003-2004)
    • Define the space under the trees into a reflection area (2001)
    • Build “The Worlds Largest Adirondack Chair” and place it in front of the year round offices (2005)
    • Build new field in the former main parking lot (2005-2006)
    • Build several gardens (1999-2001)
  • Exterior Lighting (2002)

Program areas

  • Arts & crafts lodge (the building by the lake) (2002)
    • Rebuilt the front deck 12’x 24’
    • Paint
    • Reinstall existing water hook up
  • Health Center (2000)
    • Renovate the interior and bathroom
    • Replace the heater
    • Insulate the building
    • Convert the water heater to on-demand (2003)
  • Pottery (2002)
    • Rebuild the front deck
    • Reconnect the cold and hot water (2000)
  • Maintenance (2000-2004)
    • Renovate the maintenance building
    • Reconnect water
  • Vespers / Lower amphitheater
    • Build the amphitheater (2000)
    • Build the stage (2004)
  • Dining Hall
    • Purchase wood stove (Propane) (2003)
    • Purchase new Plexiglas windows/screens (2003)
    • Paint floor (2002)
    • Paint building (2002)
    • Replace sink and change hot water to on-demand (2003)
    • Landscape (2006)
  • Cooks cabin (2002)
    • Renovate the bathroom
  • Archery
    • Renovate building (2001)
    • Renovate building after snow collapse (2003)
    • Rebuilt retaining wall (2003)
  • Sports cabin (2005)
    • Open up the front of the building and build bleacher stairs
    • Covering for lawn mower
  • Hobbs Field
    • Fertilize (1998-2005)
    • Scoreboard (2001)
    • Rebuild infield (2000)
    • Drinking fountain (2004)
    • Resurface basketball court (2003)
    • New basketball hoops (2003)
    • Extend water to right field (2004)
    • Retaining wall first base line (2001)
    • Retaining wall basketball court white pine (2001)
  • Game area
    • Miniature golf course (2005)
    • Horseshoes (1999)
    • Tetherball (2000)
    • Land clearing (2005)
    • Rest area overlooking lake (2004)
  • Playground
    • Built a large playground with 12 elements (1999-2001)
    • Fence the area
  • Mountain Biking
    • Purchase 20 bikes (1999-2004)
    • Purchase 30 helmets
    • Purchase spare parts
    • Purchased a storage shed (1999)
  • Amphitheater
    • Extended seating (2000-2004)
    • Stage (2001)
    • Stage addition (2003)
    • An amphitheater speaker system (2004)
  • Ropes Course & Adventure Camp
    • A new 7 element high ropes course (1998-2000),
    • A climbing wall (2000)
    • Climbing equipment and hardware (1998-2005)
    • 10 low elements (1998-2004)
    • Debrief area (2000)
    • Two Storage shed (2000)
    • Burma Bridge (2002)

Cabin Areas

  • Eagles
    • Repaint interior (2001)
    • Repaint/trim exterior (2000)
    • Landscape (1998-2005)
    • Bathroom stair renovation (2005)
  • Kadet
    • 50 new bunk beds and mattresses (2003)
    • Renovate bathrooms (2004)
    • Tongue and groove walls
    • Build new stalls
    • Paint ceiling(2005)
    • Interior and exterior paint (2000-2001)
    • Extensive Landscape (2006)
    • Tongue and groove each cabin walls and ceilings (2006)
    • Deck 8’ x 14’ deck and stairs (2006)
    • Build a porch for each cabin (2006)
    • Build new windows and screens (2006)
    • Re roof (2006)
    • Re paint (2006)
    • Fascia replacement (2006)
    • Teepee platform (2002)
    • Two teepee’s (2002)
    • Changing stalls (2005)
  • Middler
  • 50 new bunk beds and mattresses (2002)
  • Renovate bathrooms (2004)
  • Tongue and groove walls
  • Build new stalls
  • Rebuild shower stalls (2000)
  • Paint ceiling(2005)
  • Extensive Landscape (2006)
  • Tongue and groove each cabin walls and ceilings (2006)
  • Deck 8’ x 14’ deck and stairs (2006)
  • Build a porch for each cabin (2006)
  • Build new windows and screens (2006)
  • Re roof (2006)
  • Re paint (2006)
  • Fascia replacement (2006)
  • Build three teepee platforms (2002)
  • Three teepee’s (2002)
    • Driveway (2005)
    • Cut all identified trees and chip branches
    • Stump all trees
    • Dig stump pit behind Courtside cabins
    • Haul necessary fill to the end of the driveway, grade and compact
    • Widen entire driveway from 16’ to 24’ (20’ road with 2’ shoulder on each side)
    • Grade the lower parking lot
    • Grade and widen the upper parking lot
    • Widen the hill coming up to the upper parking lot.
    • Widen the access road to the dining hall to accommodate head in parking
    • Clear the future septic area behind eagle cabins
    • All stumps hauled to stump pit and the area was filled and graded.
    • Fencing along the road
    • Three new culverts
    • Move the phone pole at the end of the road
    • Landscape the road (2005-2006)

Waterfront

  • 26 kayaks
  • 50 lifejackets
  • 30 kayak paddles
  • Fishing supplies
  • A 40 foot fishing dock,
  • Two x 80 foot long dock that extends from shore
  • A 100 foot cross dock that connects the two main docks
  • A 40 foot iceberg dock
  • An inflatable Iceberg
  • A lifeguard chair
  • A backboard and rescue tubes
  • 6 windsurfers
  • A new fence surrounding the swim area

Other improvements

  • 50 Adirondack chairs (1999-2005)
  • 75 picnic tables (1999-2005)
  • Design an approved 2,400 gallon/day septic system
  • Land clearing throughout camp (1998-2005)
  • Office improvements
    • 12 new computers
    • Several printers
    • Upgraded copy machine
    • Networked system
    • Fax machine
    • 2 Refrigerators in offices
    • New office furniture in each office
    • New furniture in the conference room
    • A new phone system

Vehicles

  • 3 vans and mahogany luggage racks (1999-2001)
  • 2 mini busses (2002-2004)
  • A Kubota tractor and trailer (2001)
  • Nissan Pick up truck (2001)
  • Mini Van (2002)

Program Supplies

  • Pottery equipment (2001)
  • Drama and music supplies (2000)
  • Popcorn and cotton candy machines (2000)
  • 50 pairs of snowshoes (2001)
  • A PA system
  • Treadwall climbing wall
  • 7 aluminum tables